-
Suggestion
-
Resolution: Unresolved
-
179
-
86
-
Issue Summary
Using the "old" issue view, sub-tasks can be added to Epics using the "more(...)" button at the top-right of the screen.
There is no way to add sub-tasks to epics using the new issue view.
Environment
Jira Software cloud
Steps to Reproduce
- Enable the new issue view
- Create a Jira Software classic project
- Add an Epic to this project
- Click more(...) at the top-right of the screen
Expected Results
The option Create sub-task is visible
Actual Results
The option Create sub-task is not visible
Notes
Workaround
There is no current work around
- is duplicated by
-
JRACLOUD-82893 The new Parent field allows subtasks to be added to Epics
-
- Closed
-
- is related to
-
JRACLOUD-89893 Remove the "Create sub-task "option in issue types above epics
- Closed
- relates to
-
JRACLOUD-84220 Subtask under Epic/above hierarchy can be created from Issue navigator
-
- Closed
-
-
JRACLOUD-91572 Option to drill down to the Subtask level in the Timeline (Formerly Roadmap)
- Under Consideration
- resolves
-
JRACLOUD-89911 Create Subtask button is missing on issue types above Epic Level
- Not Being Considered
- mentioned in
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...